HVDC or high-voltage, direct current electric power transmission systems contrast with the more common alternating-current systems as a means for the bulk transmission of electrical power. The modern form of HVDC transmission uses technology developed extensively in the 1930s in Sweden at ASEA. Early commercial installations include one in the USSR in 1951 between Moscow and Kashira, and a 10-20 MW system in Gotland, Sweden in 1954[1].


Advantages of high voltage transmission[]

Early electric power distribution schemes used direct-current generators located near the customer's loads. As electric power became more widespread, the distances between loads and generating plant increased. Since the flow of current through the distribution wires resulted in a voltage drop, it became difficult to regulate the voltage at the distribution circuit extremities.


Higher voltages reduce the transmission power loss or reduce the cost of conductors when transmitting a given quantity of power since a smaller current is required. Conductor cost is roughly proportional to the current carried, and conductor loss is roughly proportional to the square of the current, so higher transmission voltages improve the efficiency of transmission.


Low voltage is convenient for customer loads such as lamps and motors. The principal advantage of AC is that it allows the use of transformers to change the voltage at which power is used. No equivalent of the transformer exists for direct current, so the manipulation of DC voltages is considerably more complex. With the development of efficient AC machines, such as the induction motor, AC transmission and utilization became the norm (see War of Currents).


History of HVDC transmission[]

An early method of high-voltage DC transmission was developed by the Swiss engineer Rene Thury [2]. This system used series-connected motor-generator sets to increase voltage. Each set was insulated from ground and driven by insulated shafts from a prime mover. An early example of this system was installed in 1889 in Italy by the Society Acquedotto de Ferrari-Gallieri. This system transmitted 630 kW at 14 kV DC over a distance of 120 km[3]. Other Thury systems operating at up to 100 kV dc operated up until the 1930s, but the rotating machinery required high maintenance and had high energy loss. Various other electromechanical devices were tested during the first half of the 20th century with little commercial success[4].


The grid controlled mercury arc valve became available for power transmission during the period 1920 to 1940. In 1941 a 60 MW, +/- 200 kV, 115 km buried cable link was designed for the city of Berlin using mercury arc valves (Elbe-Project), but owing to the collapse of the German government in 1945 the project was never completed[5]. The nominal justification for the project was that, during wartime, a buried cable would be less conspicuous as a bombing target. The equipment was moved to the Soviet Union and was put into service there [6].


Introduction of the fully-static mercury arc valve to commercial service in 1954 marked the beginning of the modern era of HVDC transmission. Mercury arc valves were common in systems designed up to 1975, but since then, HVDC systems use only solid-state devices.


Advantages of HVDC over AC Transmission[]

In a number of applications HVDC is often the preferred option.


  • Undersea cables. (e.g. 250 km Baltic Cable between Sweden [7] and Germany [8].
  • Endpoint-to-endpoint long-haul bulk power transmission without intermediate 'taps', for example, in remote areas.
  • Increasing the capacity of an existing power grid in situations where additional wires are difficult or expensive to install.
  • Allowing power transmission between unsynchronised AC distribution systems.
  • Reducing the profile of wiring and pylons for a given power transmission capacity.
  • Connection of remote generating plant to the distribution grid, for example Nelson River Bipole.
  • Stabilising a predominantly AC power-grid,without increasing maximum prospective short circuit current.

Long undersea cables have a high capacitance. While this has minimal effect for DC transmission, the current required to charge and discharge the capacitance of the cable causes additional power losses when the cable is carrying AC. In addition, AC power is lost to dielectric losses.


HVDC can carry more power per conductor, because for a given power rating the constant voltage in a DC line is lower than the peak voltage in an AC line. This voltage determines the insulation thickness and conductor spacing. This allows existing transmission line corridors to be used to carry more power into an area of high power consumption, which can lower costs.


Increased stability of power systems[]

Because HVDC allows power transmission between unsynchronised AC distribution systems, it can help increase system stability, by preventing cascading failures from propagating from one part to another of a wider power transmission grid, whilst still allowing power to be imported or exported in the event of smaller failures. This has caused many power system operators to contemplate wider use of HVDC technology for its stability benefits alone.


Possible health advantages of HVDC over AC transmission[]

A high-voltage DC transmission line would not produce the same sort of extremely low frequency (ELF) electromagnetic field as would an equivalent AC line. It is speculated by those who believe that ELF radiation is harmful that such a reduction in EM fields would be beneficial to health. The benefits would extend only to those near the transmission lines, as the electric and magnetic fields associated with high current AC transmission lines do not travel far beyond the actual lines themselves. These fields are, however, also associated with electrical equipment and household appliances. It should be noted that the current scientific consensus[7] does not consider ELF sources and their associated fields to be particularly harmful, and that deployment of HVDC equipment would not completely eliminate electric fields, as there would still be DC electric field gradients between the conductors and ground.


Disadvantages[]

The required static invertors are expensive and cannot be overloaded very much. At smaller transmission distances the losses in the static inverters may be bigger than in an AC powerline, and the cost of the inverters may not be offset by reductions in line construction cost.


In contrast to AC systems, realizing multiterminal systems is complex, as is expanding existing schemes to multiterminal systems. Controlling power flow in a multiterminal DC system requires good communication between all the terminals.


AC network interconnections[]

AC transmission lines can only interconnect synchronized AC networks that oscillate at the same frequency and in phase. Many areas that wish to share power have unsynchronized networks. The power grids of the UK, Northern Europe and continental Europe all operate at 50 Hz but are not synchronized. Japan has 50 Hz and 60 Hz networks. Continental North America, while operating at 60 Hz throughout, is divided into regions which are unsynchronised: East, West, Texas and Quebec. Brazil and Paraguay, which share the massive Itaipu hydroelectric plant, operate on 60 Hz and 50 Hz respectively. However, HVDC systems make it possible to interconnect unsynchronized AC networks, and also add the possibility of controlling AC voltage and reactive power flow.


A generator connected to a long AC transmission line may become unstable and fall out of synchronization with a distant AC power system. An HVDC transmission link may make it economically feasible to use remote generation sites. Wind farms located off-shore may use HVDC systems to collect power from multiple unsynchronized generators for transmission to the shore by an underwater cable.


In general, however, an HVDC power line will interconnect two AC regions of the power-distribution grid. Machinery to convert between AC and DC power adds a considerable cost in power transmission. The conversion from AC to DC is known as rectification, and from DC to AC as inversion. Above a certain break-even distance (about 50 km for under sea cables, and perhaps 600–800 km for overhead cables), the lower cost of the HVDC electrical conductors outweighs the cost of the electronics.


The conversion electronics also present an opportunity to effectively manage the power grid by means of controlling the magnitude and direction of power flow. An additional advantage of the existence of HVDC links, therefore, is potential increased stability in the transmission grid.


Rectifying and inverting[]

Rectifying and inverting components[]

Early static systems used mercury arc rectifiers, which were unreliable. Nevertheless some HVDC systems using mercury arc rectifiers are still in service in 2005. The thyristor valve was first used in HVDC systems in the 1960s. The thyristor is a solid-state semiconductor device similar to the diode, but with an extra control terminal that is used to switch the device on at a particular instant during the AC cycle. The insulated-gate bipolar transistor (IGBT) is now also used and offers simpler control and reduced valve cost.


Because the voltages in HVDC systems, up to 800 kV in some cases, exceed the breakdown voltages of the semiconductor devices, HVDC converters are built using large numbers of semiconductors in series.


The low-voltage control circuits used to switch the thyristors on and off need to be isolated from the high voltages present on the transmission lines. This is usually done optically. In a hybrid control system, the low-voltage control electronics sends light pulses along optical fibres to the high-side control electronics. Another system, called direct light triggering, dispenses with the high-side electronics, instead using light pulses from the control electronics to switch light-triggered thyristors (LTTs).


A complete switching element is commonly referred to as a 'valve', irrespective of its construction.


Rectifying and inverting systems[]

a DC->AC converter
A simple DC to AC converter using 2 solenoids, a capacitor and a triode

Rectification and inversion use essentially the same machinery. Many substations are set up in such a way that they can act as both rectifiers and inverters. At the AC end a set of transformers, often three physically separate single-phase transformers, isolate the station from the AC supply, to provide a local earth, and to ensure the correct eventual DC voltage. The output of these transformers is then connected to a bridge rectifier formed by a number of valves. The basic configuration uses six valves, connecting each of the three phases to each of the DC rails. However, with a phase change only every sixty degrees, considerable harmonics remain on the DC rails.


An enhancement of this configuration uses 12 valves (often known as a twelve-pulse system). The AC is split into two separate three phase supplies before transformation. One of the sets of supplies is then configured to have a star (wye) secondary, the other a delta secondary, establishing a thirty degree phase difference between each of the sets of three phases. With twelve valves connecting each of the two sets of three phases to the two DC rails, there is a phase change every 30 degrees, and harmonics are considerably reduced.


In addition to the conversion transformers and valve-sets, various passive resistive and reactive components help filter harmonics out of the DC rails.


Configurations[]

Monopole and earth return[]

In a common configuration, called monopole, one of the terminals of the rectifier is connected to earth ground. The other terminal, at a potential high above, or below, ground, is connected to a transmission line. The earthed terminal may or may not be connected to the corresponding connection at the inverting station by means of a second conductor.


If no metallic conductor is installed, current flows in the earth between the earth electrodes at the two stations. The issues surrounding earth-return current include


  • Electrochemical corrosion of long buried metal objects such as pipelines
  • Underwater earth-return electrodes in seawater may produce chlorine or otherwise affect water chemistry.
  • An unbalanced current path may result in a net magnetic field, which can affect magnetic navigational compasses for ships passing over an underwater cable.

These effects can be eliminated with installation of a metallic return conductor between the two ends of the monopolar transmission line. Since one terminal of the converters is connected to earth, the return conductor need not be insulated for the full transmission voltage which makes it less costly than the high-voltage conductor. Use of a metallic return conductor is decided based on economic, technical and environmental factors[8].


Modern monopolar systems for pure overhead lines carry typically 1500 MW[9]. If underground or seacables are used the typical value is 600 MW.


Bipolar[]

In bipolar transmission a pair of conductors is used, each at a high potential with respect to ground, in opposite polarity. Since these conductors must be insulated for the full voltage, transmission line cost is higher than a monopole with a return conductor. However, there are a number of advantages to bipolar transmission which can make it the attractive option.


  • Under normal load, negligible earth-current flows, as in the case of monopolar transmission with a metallic earth-return; minimising earth return loss and environmental effects.
  • When a fault develops in a line, with earth return electrodes installed at each end of the line, current can continue flow using the earth as a return path, operating in monopolar mode.
  • Since for a given power rating bipolar lines carry only half the current of monopolar lines, the cost of the second conductor is reduced compared to a monopolar line of the same rating.
  • In very adverse terrain, the second conductor may be carried on an independent set of transmission towers, so that some power may continue to be transmitted even if one line is damaged.

A bipolar system may also be installed with a metallic earth return conductor.


Bipolar systems may carry as much as 6400 MW at voltages of +/-800 kV. Under sea cable installations initially commissioned as a monopole may be upgraded with additional cables and operated as a bipole.

Back to back[]

A back-to-back station is a plant in which both static inverters are in the same area, usually even in the same building and the length of the direct current line is only a few meters. HVDC back-to-back stations are used for


  • coupling of electricity mains of different frequency (as in Japan)
  • coupling two networks of the same nominal frequency but no fixed phase relationship
  • different frequency and phase number (for example, as a replacement for traction current converter plants)
  • different modes of operation (as until 1995/96 in Etzenricht, Dürnrohr and Vienna).

In contrast to HVDC long-distance lines, the DC voltage in the intermediate circuit can be selected freely at HVDC back-to-back stations because of the short conductor length. The DC voltage is as low as possible, in order to build a small valve hall and to avoid parallel switching of valves. For this reason at HVDC back-to-back stations the strongest available static inverter valves are used.



Tripole - Current Modulating Control[]

A newly patented scheme (US Patent 6714427) is particularly applicable to conversion of existing AC transmission lines to HVDC. Two of the three circuit conductors are operated as a bipole. The third conductor is used as a parallel monopole, equipped with reversing valves (or parallel valves connected in reverse polarity). The parallel monopole periodically relieves current from one pole or the other, switching polarity over a span of several minutes. The bipole conductors would be loaded to either 1.37 or 0.37 of their thermal limit, with the parallel monopole always carrying +/- 1 times its thermal limit current. The combined RMS heating effect is as if each of the conductors was always carrying 1.0 of its rated current. This allows heavier currents to be carried by the bipole conductors, and full use of the installed third conductor for energy transmission. The higher current compared to AC operation may also help prevent ice build-up during winter storms. The system can be arranged to circulate high currents through the line conductors even if load demand is low.


Combined with the higher average power possible with a DC transmission line for the same line to ground voltage, a tripole conversion of an existing AC line could allow up to 80% more power to be transferred using the same transmission right-of-way, towers, and conductors. Some AC lines cannot be loaded to their thermal limit due to system stability, reliability, and reactive power concerns, which would not exist with an HVDC link.


The system operates without earth-return current. Since a single failure of a pole converter or a conductor results in only a small loss of capacity and no earth-return current, reliability of this scheme would be high. No time would be lost in switching if a conductor broke. The valves would inherently have an emergency overload rating in bipole mode. This would possibly allow great increase in power transmission with significant effect in congested transmission systems, where consequences of a single line failure limit the allowed loading of other parallel transmission lines. While capital costs are higher than for a bipole conversion operating at the same voltage class, the extra power capability reduces incremental cost per megawatt. Depending on transmission line physical configuration, replacement of insulators may be required to achieve the highest power rating, to insure proper line-to-line clearance distances.


As of 2005 no tri-pole conversions are in operation, although a transmission line in India has been converted to bipole HVDC.


See Presentation on Current-Modulated Control


United States Department of Energy comments received on an inquiry into power transmission bottlenecks


Corona discharge[]

Corona discharge is the creation of ions in a fluid (such as air) by the presence of a strong electric field. Electrons are torn from un-ionised air, and either the positive ions or else the electrons are attracted to the conductor, whilst the charged particles drift. This effect can cause considerable power loss, create audible and radio-frequency interference, generate toxic compounds such as oxides of nitrogen and ozone, and lead to arcing.


Both AC and DC transmission lines can generate coronas, in the former case in the form of oscillating particles, in the latter a constant wind. Due to the space charge formed around the conductors, an HVDC system may have about half the loss per unit length of a high voltage AC system carrying the same amount of power. With monopolar transmission the choice of polarity of the energised conductor leads to a degree of control over the corona discharge. In particular, the polarity of the ions emitted can be controlled, which may have an environmental impact on particulate condensation (particles of different polarities have a different mean-free path). Negative coronas generate considerably more ozone than positive coronas, and generate it further downwind of the power line, creating the potential for health effects. The use of a positive voltage will reduce the ozone impacts of monopole HVDC power lines.


Applications[]

Overview[]

The controllability of current-flow through HVDC rectifiers and inverters, their application in connecting unsynchronized networks, and their applications in efficient under sea cables mean that HVDC cables are often used at national boundaries for the exchange of power. Offshore windfarms also require undersea cables, and their turbines are unsynchronized. In very long-distance connections between just two points, for example around the remote communities of Siberia, Canada, and the Scandinavian North, the decreased line-costs of HVDC also makes it the usual choice. Other applications have been noted throughout this article.


The development of insulated gate bipolar transistors and gate turn-off thyristors has made smaller HVDC systems economical. These may be installed in existing AC grids for their role in stabilizing power flow without the additional short-circuit current that would be produced by an additional AC transmission line. One manufacturer calls this concept "HVDC Light", and has extended the use of HVDC down to blocks as small at a few tens of megawatts and lines as short as a few score kilometres of overhead line.


System configurations[]

A HVDC link in which the two AC-to-DC converters are housed in the same building, the HVDC transmission existing only within the building itself, is called a back-to-back HVDC link. This is the common configuration for interconnecting two unsynchronised grids or for changing frequency or for stabilizing an AC network.


HVDC back-to-back stations can also be designed to deliver single phase AC. This is required for Traction current converter plants.


The most common configuration of an HVDC link is a station-to-station link, where two inverter/rectifier stations are connected by means of a dedicated HVDC link. This is also a configuration commonly used in connecting unsynchronised grids, in long-haul power transmission, and in undersea cables.


Multi-terminal HVDC links, connecting more than two points, are rare. The configuration of multiple terminals can be series, parallel, or hybrid (a mixture of series and parallel). Parallel configuration tends to be used for large capacity stations, and series for lower capacity stations. An example is the 2000 MW Quebec - New England Transmission system opened in 1992, which is currently the largest multi-terminal HVDC system in the world[10].



Realized HVDC systems[]


=== Systems that use (or used) mercury arc rectifiers ===
{| class="wikitable sortable" border="1" cellpadding="4" cellspacing="0"
 ! Name  ||width="180"|Converter Station 1 ||width="180"|Converter Station 2||Cable (km) ||width="50"|Overhead line (km) ||Voltage (kV) ||Power (MW) ||Year ||Type||class="unsortable" width="200"| Remarks
|-
| Mechanicville, New York||US Mechanicville,NY ||US Schenectaday, NY || ||37||12 ||5||1932||experimental, frequency conversion 40 to 60 Hz, dismantled after WW II<ref> James A. Besha, The historic Mechanicville Hydroelectric Station part 2, IEEE INDUSTRY APPLICATIONS MAGAZINE Mar/Apr 2007, page 8</ref>
|-
| Lehrte-Misburg HVDC||Germany - Lehrte Template:Coord ||Germany - Hannover/Misburg ||? ||||80 ||16||1944||experimental facility, dismantled
|-
| Elbe-Project||Germany , Vockerode Template:Coord ||Germany - Berlin, Marienfelde Template:Coord ||115|| 0||200||60||1945||never placed in service, dismantled
|-
| Moscow-Kashira||Russia - Moscow||Russia - Kashira||100 ||||200 ||30||1951||built of parts of HVDC Elbe-Project, shut down (when?)
|-
| Cross-Channel||France - Echingen Template:Coord ||UK - Lydd Template:Coord ||64 ||||100||160||1961||shut down in 1984
|-
| Gotland 1||Sweden - Västervik Template:Coord ||Sweden - Yigne Template:Coord ||98 ||||200 ||20||1954||shut down in February 1986
|-
| Konti-Skan 1||Denmark - Vester Hassing Template:Coord ||Sweden - Stenkullen Template:Coord ||87 ||89 ||250 ||250||1964||replaced in August 2006 by modern converters using thyristors
|-
| SACOI 1||Italy - Suvereto Template:Coord ||France- Lucciana Template:Coord ; Codrongianos, Italy Template:Coord||304 ||118 ||200 ||200||1965||replaced in 1986 by thyristors, multiterminal scheme
|-
| HVDC Inter-Island||NZ - Benmore Template:Coord ||NZ - Haywards Template:Coord ||40 ||535 ||270||1200||1965||upgraded in 1991. Pole 1 of this system still uses mercury arc rectifiers, one of the last such systems in the world to continue with this technology. Pole 2 is thyristor bridge.
|-
| Volgograd-Donbass||Russia - Volzhskaya Template:Coord ||Russia - Mikhailovskaya Template:Coord ||||475 ||400||750||1964|| 
|-
| Sakuma, Back-to-Back Station ||Japan - Sakuma Template:Coord ||Japan - Sakuma Template:Coord ||||||125||300||1965||replaced in 1993 by new converter using light-triggered thyristors
|-
| Pacific DC Intertie||US - Oregon - Celilo Template:Coord ||US - California - Sylmar Template:Coord , Template:Coord ||||1362 ||500||3100||1970||transmission voltage until 1984 400kV, maximum transmission 1440 MW power until 1982 1440 MW, from 1982 to 1984 1600 MW, from 1984 to 1989 2000 MW, mercury arc rectifiers replaced in 2004 by photothyristors.  Original supplier ASEA/GE.  1989 upgrade by ABB.<ref name=hvdcproj01 />
|-
| Vancouver Island 1||Canada - Delta, BC Template:Coord ||Canada - North Cowichan, BC Template:Coord ||42 ||33 ||260 ||312||1968|| 
|-
| Nelson River Bipole 1||Canada - Gillam Template:Coord ||Canada - Rosser, Manitoba Template:Coord ||||895 ||450||1620||1971||Used the largest mercury arc rectifiers ever built. Poles converted to thyristors in 1993, 2004.
|-
| Kingsnorth||UK- Kingsnorth Template:Coord ||UK - London-Beddington Template:Coord ; London-Willesden Template:Coord ||85 ||||266||640||1975||shut down in 1987|}

=== Systems that used thyristors from first power-on ===
{| class="wikitable sortable" border="1" cellpadding="4" cellspacing="0"
 ! Name  ||width="180"|Converter Station 1 ||width="180"|Converter Station 2||Cable (km) ||width="50"|Overhead line (km) ||Voltage (kV) ||Power (MW) ||Year ||Type||class="unsortable" width="200"| Remarks
|-
| Eel River, Back-to-Back Station||Canada- Eel River, NB Template:Coord ||Canada- Eel River, NB Template:Coord ||||||80 ||320||1972|| 
|-
| Vancouver Island 2||Canada - Delta, BC Template:Coord ||Canada - North Cowichan, BC Template:Coord ||33 ||42 ||280 ||370||1977|| 
|-
| David A. Hamil, Back-to-Back Station||USA- Stegall, Nebraska Template:Coord ||USA- Stegall, Nebraska Template:Coord ||||||±50 ||100||1977|| 
|-
| Shin Shinano, Back-to-Back Station||Japan - Shin Shinano Template:Coord ||Japan - Shin Shinano Template:Coord||||||125||600||1977|| 
|-
| Square Butte||US - Center, ND (Young) Template:Coord ||US - Adolph, MN (Arrowhead) Template:Coord ||||749 ||250||500||1977|| 
|-
| Cross-Skagerak 1 + 2||Denmark - Tjele Template:Coord ||Norway - Kristiansand Template:Coord ||130 ||100 ||250||500||1977|| 
|-
| CU||US- Underwood, ND <br>(Coal Creek) Template:Coord ||US- Rockford, MN (Dickinson) Template:Coord ||||710 ||400 ||1000||1979|| 
|-
| Hokkaido-Honshu||Japan- Hakodate Template:Coord  ||Japan - Kamikita Template:Coord ||44 ||149 ||250 ||300||1979|| 
|-
| Cahora Bassa||Mozambique - Songo Apollo HVDC Template:Coord  ||South Africa - Apollo Template:Coord ||||1420 ||533||1920||1979||  First HVDC with voltage above 500kV
|-
| Acaray, Back-to-Back Station||Paraguay - Ciudad de Este Template:Coord  || Paraguay - Ciudad de Este Template:Coord ||||||25.6 ||50||1981|| 
|-
| Inga-Shaba||Zaire - Kolwezi Template:Coord ||Zaire - Inga Template:Coord) ||||1700 ||500||560||1982|| 
|-
| Vyborg, Back-to-Back Station||Russia - Vyborg Template:Coord ||Russia - Vyborg Template:Coord ||||||85 ||1065||1982|| 
|-
| Dürnrohr, Back-to-Back Station||Austria - Dürnrohr Template:Coord ||Austria - Dürnrohr Template:Coord ||||||145 ||550||1983||shut down in October 1996, dismantled in 2007
|-
| Gotland 2||Sweden - Västervik Template:Coord ||Sweden - Yigne Template:Coord ||92.9 ||6.6 ||150 ||130||1983|| 
|-
| Artesia, New Mexico (Eddy County HVDC, Back-to-Back Station), Back-to-Back Station||US- Artesia, NM Template:Coord||US - Artesia, NM Template:Coord||||||82 ||200||1983|| 
|-
| Oklaunion, Back-to-Back Station||US- Oklaunion, TX Template:Coord ||US- Oklaunion, TX Template:Coord || || ||82 ||200||1984|| 
|-
| Blackwater, New Mexico, Back-to-Back Station||US- Blackwater, NM Template:Coord ||US- Blackwater, NM Template:Coord ||||||57 ||200||1984|| 
|-
| Chateauguay, Back-to-Back Station||Saint-Constant - Châteauguay Template:Coord ||Saint-Constant - Châteauguay Template:Coord ||||||140 ||1000||1984|| 
|-
| Itaipu 2||Brazil - Foz do Iguaçu, Paraná Template:Coord ||Brazil - São Roque, São Paulo Template:Coord ||||805 ||600 ||3150||1984||Supplier:ABB
|-
| Itaipu 1||Brazil - Foz do Iguaçu, Paraná Template:Coord ||Brazil - São Roque, São Paulo Template:Coord ||||785 ||600 ||3150||1984||Supplier:ABB
|-
| Madawaska, Quebec, Back-to-Back Station||Canada- Degelis Template:Coord ||Degelis Template:Coord ||||||140 ||350||1985|| 
|-
| Miles City, Montana, Back-to-Back Station||US - Miles City Template:Coord ||US - Miles City Template:Coord ||||||82 ||200||1985|| 
|-
| Highgate, VT, Back-to-Back Station || US - Highgate, Vermont Template:Coord ||US - Highgate, VT Template:Coord ||||||56 ||200||1985|| 
|-
| Nelson River Bipole 2||Canada - Sundance Template:Coord ||Canada - Rosser Template:Coord ||||937 ||500 ||1800||1985|| 
|-
| Cross-Channel (new)||France - Les Mandarins Template:Coord ||UK - Sellindge Template:Coord ||72 ||||270 ||2000||1986||2 bipolar systems
|-
| Uruguaiana, Back-to-Back Station ||Brazil - Uruguaiana Template:Coord||Brazil - Uruguaiana Template:Coord ||||||17.9 ||53.9||1986|| 
|-
| Path 27||US - Intermountain, Utah Template:Coord ||US -  Adelanto, California Template:Coord ||||785 ||500 ||1920||1986|| 
|-
| Broken Hill, Back-to-Back Station||Australia - Broken Hill Template:Coord ||Australia - Broken Hill Template:Coord ||||||8.33 ||40||1986|| 
|-
| Gotland 3||Sweden - Västervik Template:Coord ||Sweden - Yigne Template:Coord ||98 ||||150 ||130||1987|| 
|-
|HVDC Zhoushan|| Ningbo - China || Gao Tongge - China ||12||42||100||50||1987||Thy||
|-
|Konti-Skan 2||Denmark - Vester, Hassing Template:Coord ||Sweden - Lindome Template:Coord ||87 ||60 ||285 ||300||1988|| 
|-
| Virginia Smith, Back-to-Back Station||US -  Sidney, Nebraska Template:Coord ||US - Sidney, Nebraska Template:Coord || || || 500 ||200||1988|| <ref name=siemens01>"HVDC Transformers- details". Siemens. https://www.energy-portal.siemens.com/static/hq/en/products_solutions/19024_163620_hvdc-transformers.html. Retrieved 2008-12-19. </ref>
|-
| McNeill, Back-to-Back Station||Canada - Mc Neill, Alberta Template:Coord ||Canada - Mc Neill, Alberta Template:Coord ||||||42 ||150||1989|| 
|-
|Gezhouba - Shanghai "GeSha" or "Ge-Nan"||China - Gezhouba Template:Coord ||China - Nan Qiao Template:Coord ||||1046 ||500 ||1200||1989||  Supplier: Siemens<ref name=tdworld1 />
|-
|Fenno-Skan||Finland - Rauma Template:Coord ||Sweden - Dannebo Template:Coord ||200 ||33 ||400 ||500||1989|| 
|-
| Vindhyachal, Back-to-Back Station||India - Vindhyachal Template:Coord ||India - Vindhyachal Template:Coord ||||||176 ||500||1989|| 
|-
|Sileru-Barsoor||India - Sileru Template:Coord ||India - Barsoor Template:Coord ||||196 ||200 ||400||1989|| 
|-
|Quebec - New England Transmission||Canada - Radisson, Quebec Template:Coord ||Canada - Nicolet, Quebec Template:Coord;<br> Canada - Des Cantons, Quebec Template:Coord;<br> USA - Comerford, NH Template:Coord;<br> USA - James Bay, MA Template:Coord || 5 ||1100 ||450 ||2000||1991||Multiterminal- 3 terminals.  Supplier:ABB.<ref name=hvdcproj01 />
|-
|Rihand-Delhi||India - Rihand Template:Coord ||India - Dadri  Template:Coord ||||814 ||500 ||1500||1992|| 
|-
| Cross-Skagerak 3||Denmark - Tjele Template:Coord ||Norway - Kristiansand Template:Coord ||130 ||100 ||350 ||500||1993|| 
|-
|Inter-Island NZ 2||NZ - Benmore Template:Coord ||NZ - Haywards Template:Coord ||40 ||570 ||350 ||640||1992|| 
|-
|Wolmirstedt, Back-to-Back Station||Germany - Wolmirstedt Template:Coord ||Germany - Wolmirstedt Template:Coord ||||||160 ||600||(1992)||construction work was stopped after reunification, static inverter hall is today part of a recycling yard
|-
|SACOI 2||Italy - Suvereto Template:Coord ||France- Lucciana Template:Coord ; Codrongianos, Italy Template:Coord ||118 ||304 ||200 ||300||1992||multiterminal scheme
|-
|Etzenricht, Back-to-Back Station||Germany - Etzenricht Template:Coord ||Germany - Etzenricht Template:Coord ||||||160 ||600||1993||shut down in October 1995, dismantled in 2009
|-
|Vienna-Southeast, Back-to-Back Station||Austria - Vienna Template:Coord ||Austria - Vienna Template:Coord ||||||142 ||600||1993||shut down in October 1996, dismantled in 2007
|-
|Baltic-Cable||Germany - Lübeck- Herrenwyk Template:Coord ||Sweden - Kruseberg Template:Coord ||250 ||12 ||450 ||600||1993|| 
|-
|Haenam-Cheju||SouthKorea - Haenam||SouthKorea - Jeju||101 ||||180 ||300||1996|| 
|-
|Kontek||Denmark - Bjaeverskov Template:Coord || Germany - Bentwisch Template:Coord ||170 ||||400 ||600||1996|| 
|-
| Chandrapur  - Padghe ||India-Chandrapur Template:Coord? || India - Padghe Template:Coord || 0||900 ||500 ||1500||1997|| 
|-
|Leyte - Luzon||Philippines - Ormoc, Leyte Template:Coord ||Naga, Camarines Sur||21 ||430 ||400 ||1600 MW||1998|| 
|-
|Welch-Monticello, Back-to-Back Station||US - Welch-Monticello, TX Template:Coord   Welch Plant   Template:Coord||US - Welch-Monticello, TX Template:Coord  Monticello Plant Template:Coord  ||||||162 ||600||1998|| 
|-
|Visby-Nas||Sweden - Nas Template:Coord ||Sweden - Visby Template:Coord ||70 ||||80 ||50||1999|| 
|-
| Minami-Fukumitsu, Back-to-Back Station||Japan - Minami- Fukumitsu Template:Coord ||Japan - Minami- Fukumitsu Template:Coord ||||||125 ||300||1999|| 
|-
| Garabi HVDC back-to-back station||Brazil- Garabi Template:Coord ||Brazil- Garabi Template:Coord ||||||±70 ||400||2000|| 
|-
|SwePol || Poland - Bruskowo Wielkie Template:Coord || Sweden - Stärnö Template:Coord  ||245 ||||450 ||600||2000|| 
|-
|Kii Channel||Japan - Anan||Japan - Kihoku Template:Coord ||50 ||50 ||500 ||1400||2000|| 
|-
|Italy-Greece||Greece - Arachthos Template:Coord ||Italy - Galatina Template:Coord ||200 ||110 ||400 ||500||2001|| 
|-
|Tianshengqiao - Guangzhou "Tian-Guang" or TSQ||China - Tianshengqiao|| China - Guangzhou||||960 ||500 ||1800||2001||  Supplier: Siemens <ref name=tdworld1 />
|-
|Moyle||UK - Auchencrosh Template:Coord ||UK - N. Ireland- Ballycronan More Template:Coord ||63.5 || ||250 ||250||2001|| 
|-
|East South-II ESI II||India - Talcher, Orissa||India - Kolar, Karnataka Template:Coord ||||1450 ||500 ||2000||2002|| <ref name=siemens01 />
|-
|Thailand-Malaysia||Thailand - Khlong Ngae Template:Coord ||Malaysia - Gurun Template:Coord||||110 ||300 ||300||2002|| 
|-
|Three Gorges-Changzhou||China - Longquan||China - Zhengping Template:Coord ||||860 ||500 ||3000||2003||  From north bank of Three Gorges to Zhengping, 200 km from Shanghai in the East grid. Supplier:ABB/Siemens <ref name=hvdcproj01 /><ref name=tdworld1>"ROLE OF THREE GORGES - CHANGZHOU HVDC IN INTERCONNECTING CENTRAL AND EAST CHINA". ABB Asea Brown Boveri. http://library.abb.com/global/scot/scot221.nsf/veritydisplay/5a3c07c06ce80821c1256fda003b4d45/$File/Role%20of%20Three%20Gorges%20-%20Changzhou%20HVDC%20in%20Interconnecting%20.pdf. Retrieved 2008-12-19. </ref><ref>Template:Cite journal</ref>
|-
|Rapid City DC Tie, Back-to-Back Station||US - Rapid City, South Dakota Template:Coord ||US - Rapid City, South Dakota Template:Coord ||||||13 ||200||2003 ||[11]
|-
|Guizhou-Guangdong I GuG I||China - Anshun, Guizhou||China - Zhaoqing, Guangdong||||980 ||500 ||3000||2004|| Supplier: Siemens<ref name=hvdcproj01 /><ref name=tdworld1 />
|-
|Three Gorges-Guangdong - Huizhou||China - Jingzhou||China - Huizhou Template:Coord ||||940 ||500 ||3000||2004|| Huizhou is 120 km east of Guangzhou.<ref>"The Three Gorges–Guangdong HVDC link". ABB Asea Brown Boveri. 2005-06-03. http://library.abb.com/global/scot/scot221.nsf/veritydisplay/63063f62424ccf9ac12570290031068a/$File/POW-0039%203GG%20project%20brochure.pdf. Retrieved 2008-12-19. </ref> Supplier = ABB <ref name=hvdcproj01 />
|-
|Visakhapatnam, Back-to-Back Station Vizag II||India - Visakhapatnam Template:Coord ||India - Visakhapatnam Template:Coord |||||| 176 || 500||2005||  Installed at Gazuwaka.  Supplier:ABB.  This is similar in specs to Vizag I and connects the Eastern and Southern grids.<ref>"THE SECOND 1 x 500 MW HVDC BACK-TO-BACK INTERCONNECTION AT VIZAG". 2005-09-29. http://library.abb.com/global/scot/scot221.nsf/veritydisplay/9eecf559e0334b5cc125708b00501cb5/$File/Cigree_VizagIIB-t-B%20d%20Rev.%2000.pdf. Retrieved 2008-12-20. </ref>
|-
|Basslink||Australia - LoyYang Template:Coord ||Australia - GeorgeTown, Tasmania Template:Coord ||298.3 ||71.8 ||400 ||600||2005|| <ref name=siemens01 /> One of the longest HVDC cable in Operation, see also NorNed.<ref name=siemens02> Template:Cite journal</ref>
|-
| Lingbao, Back-to-Back Station||China - Lingbao Template:Coord ||China - Lingbao Template:Coord ||||||168 ||360||2005|| 
|-
| Lamar Co., Colorado, Back-to-Back Station||US- Lamar Co., CO Template:Coord ||US- Lamar Co., CO Template:Coord ||||||63.6|| 210|| 2005|| Supplier: Siemens; Combination of, Back-to-Back Station HVDC & Grid Power Flow Controller (GPFC)<ref>"APPLICATION OF THE GRID POWER FLOW CONTROLLER
(GPFC) IN A BACK TO BACK PROJECT- details"
. Siemens. http://www.ptd.siemens.de/B4-202.pdf. Retrieved 2009-09-29.
 </ref>
|-
|Three Gorges-Shanghai||China - Yidu Template:Coord ||China - Shanghai Template:Coord ||||900 ||500 ||3000||2006||  Supplier:ABB <ref name=hvdcproj01 />
|-
| Higashi-Shimuzu, Back-to-Back Station ||Japan - Shimuzu Template:Coord ||Japan - Shimuzu Template:Coord ||||||125 ||300||2006|| 
|-
| Sharyland, Back-to-Back Station||US - Sharyland, TX Template:Coord ||US - Sharyland, TX Template:Coord || || ||21 ||150||2007|| 
|-
|Guizhou-Guangdong II GuG II||China - ?||China - ?||||1225 ||500 ||3000||2007|| Supplier: Siemens <ref name=hvdcproj01 /><ref name=tdworld1 />
|-
|Neptune||US - Long Island (Hicksville) NY Template:Coord ||US-Sayreville, NJ Template:Coord  ||105||||500 ||660||2007||  Supplier:Siemens <ref name=hvdcproj01 /><ref>"What is Neptune RTS?". http://www.neptunerts.com/default.asp?Ss=5&Pg=7. Retrieved 2008-12-19. </ref>
|-
|Al Fadhili, Back-to-Back Station||Saudi Arabia - Al Fadhili Template:Coord ||Saudi Arabia - Al Fadhili Template:Coord |||||| ||1800||2008|| [12]
|-
|NorNed||Netherlands - Eemshaven Template:Coord || Norway - Feda ||580 ||||450 ||700||2008|| Supplier:ABB <ref name=hvdcproj01 />
|-
|Ballia-Bhiwadi||India - Ballia|| India - Bhiwadi||||780 ||500 ||2500||2009*||  Supplier: Siemens <ref name=hvdcproj01 /><ref>Template:Cite journal</ref>
|-
|Outaouais, Back-to-Back Station||Canada - Outaouais|| Canada - Outaouais||||||315 ||625 MW (2x)||2009||  Expected completion 2009. Supplier:ABB <ref name=hvdcproj01 />
|-
|Sapei||Italy mainland|| Italy - Sardinia||440 ||||500 ||500||2009*||  Expected completion 2009-08. Supplier:ABB <ref name=hvdcproj01 />
|-
|BritNed ||UK - Grain||Netherlands - Maasvlakte ||245 ||||450 ||1000||2010*||  Expected completion 2010. Supplier:Siemens <ref name=hvdcproj01 />
|-
|Rivera, Back-to-Back Station||Uruguay - Melo || Uruguay - Melo |||| ||± 20 kV||70 MW||2010 ||  Expected completion 2010 Supplier:Areva
|-
|Yunnan - Guangdong||China - Yunnan province|| China - Guangdong||||1400 ||800 ||5000||2010*||Supplier: Siemens <ref name=tdworld1 />
|-
|Xianjiaba - Shanghai||China - Xianjiaba|| China - Shanghai||||2071||800||6400||2010*||  Expected completion 2010 monopole, 2011 for bipole. Supplier:ABB <ref name=hvdcproj01>Template:Cite journal</ref>
|-
|StoreBaelt||Denmark- Fraugde Template:Coord  ||Denmark- Herslev ~Template:Coord ||56 ||||400 ||600 MW||2010*||  Expected completion 2010. Supplier:Siemens <ref name=hvdcproj01 />
|-
|Cometa||Spain - Valencia||Spain - Mallorca ||247 ||||250 ||400 MW||2011*||  Expected completion 2011. Supplier:PRYSMIAN/NEXANS/Siemens <ref name=hvdcproj01 />
|-
|Sumatera - Jawa||Indonesia - Jawa||Indonesia - Sumatera||700 ||||500 ||3000 MW||2011*||  Expected completion 2011. Supplier:? <ref name=hvdcproj01 />
|-
|Jindo - Jeju||Korea- Jeju|| Korea - Jindo||||119 ||250 ||200 MW (2x)||2011*||  Expected completion 2011 Supplier:? <ref name=hvdcproj01 />
|-
|East West Interconnector||Ireland - Leinster||UK - Anglesea, Wales||130 |||| ||500||2012||||  Planned completion 2012. 2 alternative plans under consideration.
|-
|Biswanath- Agra|| India - Biswanath|| India - Agra||||1825||800||6000||2012*||  Expected completion 2011-2012 bipole <ref>Template:Cite journal</ref>
|-
|HVDC Ekibastuz-Centre ||Kazhakstan - Ekibastus|| Russia-Tambov ||||2400 ||750||6000 ||?|| unfinished
|-
| Sasaram , Back-to-Back Station ||India-Sasaram  || India-Sasaram || 0||0 ||205 ||500||?|| 
|-
|Vizag I||India - Visakhapatnam Gazuwaka||India - Gazuwaka|| || ||176 ||500||?|| 
|-
| Chandrapur , Back-to-Back Station ||India-Chandrapur Template:Coord || India-Chandrapur Template:Coord || 0||0 ||205 ||1000||?|| |}

Systems that used IGBTs from first power-on[]

See also[]

  • Static inverter plant
  • Valve hall
  • Electrode line
  • Electrical pylon
  • Uno Lamm

References[]

  1. ^  Narain G. Hingorani in IEEE Spectrum magazine, 1996.
  1. ^  Donald Beaty et al, "Standard Handbook for Electrical Engineers 11th Ed.", McGraw Hill, 1978
  1. ^ http://www.myinsulators.com/acw/bookref/histsyscable/
  1. ^  Shaping the Tools of Competitive Power http://www.tema.liu.se/tema-t/sirp/PDF/322_5.pdf
  1. ^ http://www.rmst.co.il/HVDC_Proven_Technology.pdf
  1. ^ http://www.ieee.org/organizations/history_center/Che2004/DITTMANN.pdf
  1. ^ ABB HVDC website
  1. ^ Scientific Facts on electromagnetic fields from Power Lines, Wiring & Appliances
  1. ^ Basslink project
  1. ^  Siemens AG "HVDC Basics" page.
  1. ^ ABB HVDC Transmission Québec - New England website